ART Timing
- devise a way for absolute timing for BCID stamp to sector logic
- plot efficiency vs. BC window
- overlay hits with simulation
- bin in terms of angle
ART Spatial Resolution
- Δx (ART, MM fit projection)
- Δy using stereo ART strips (and compare with predicted Δy given measured Δx)
- Δm (ART, MM)
- efficiency
- values as a function of Nx, NUV
Micromegas
- Everything from before
- better μTPC